Haigla korpuse ehitustööde organiseerimine
dc.contributor.advisor | Peetrimägi, Lauri | |
dc.contributor.author | Kongo, Kevin | |
dc.date.accessioned | 2024-05-13T07:39:51Z | |
dc.date.available | 2024-05-13T07:39:51Z | |
dc.date.issued | 2024-05-07 | |
dc.description.abstract | Lõputöös on autor välja toonud haiglahoone ehitustööde korraldamise erinevaid aspekte, pakkudes ülevaadet nende olulisusest ja praktilistest rakendustest. Töö hõlmab hoone asukoha ja arhitektuurse konstruktsiooni analüüsi, majanduslike kaalutluste arvestamist, ehitusgraafiku koostamist, ehitusplatsi planeerimist, ohutusmeetmete, protokollide kirjeldust, ning montaazi ja lammututööde tehnoloogiakaarti. Tehnoloogiakaartide abil kirjeldati põhjalikult tööde loetelu ja brigaadide koosseise. Lisaks oli eraldi välja toodud kasutatavad tööriistad, vajalik tehnika ja tööohutuse ning kvaliteedi tagamise nõuded. Hoone asukoha ja olemasolevate tingimuste uurimine on oluline ehitusprotsessi alguses, tagades, et ehitustööd kohandatakse vastavalt keskkonnaomadustele ja nõuetele. Ühe lõputöö osana valmistati ette ehitusplatsi üldplaan, mis hõlmas kogu objekti korralduslikku aspekti ning arvutati ehitusperioodi vee- ja elektrivajadus. Majanduslik analüüs hõlmab eelarve koostamist ja ressursside haldamist, et tagada ehitustööde kulutõhusus ja finantsiline jätkusuutlikkus. Hoone ehitustööde omahinnaks, ilma ettevõtte kasumita ja käibemaksuta, kujunes vastavalt ehituseelarvele 5 249 841 eurot. Ehitusplatsi korraldus- ja üldkulud moodustavad kogu objekti maksumusest 7 protsenti, olles kokku 361 771 eurot. Ehitusgraafiku koostamine on oluline samm tegevuste järjestamisel ja ajakava optimeerimisel, võimaldades tähtaegade täpset jälgimist ja vajadusel korrigeerimist. Ehitustööde alguskuupäevaks kujunes 10.30.2023 ning tööde kestvus on kokku 12 kuud. Hoone üleandmine tellijale ja kasutusloa taotlemine toimub 06.27.2024. Kalendergraafikus on igale tööetapile määratud optimaalne töötajate arv. Objektil on kõige rohkem ehitustöölisi veebruaris, kus töötab 50 inimest. Ehitusplatsi planeerimine hõlmab logistiliste väljakutsete ja ressursside jaotuse lahendamist, tagades sujuva ja efektiivse ehitustööde kulgemise. Töös kirjeldati tõstemehhanisme, ning ehitustööde põhiliseks tõsteseadmeks valiti autokraana Faun ATF 60-4, mille noolepikkus on 40 meetrit ja tõstevõime 60 tonni. Autor omandas väärtuslikke teadmisi ja juhiseid haiglahoone ehitustööde korraldamiseks, rõhutades põhjalikku ettevalmistust, tõhusat ressursside juhtimist ning ohutus- ja kvaliteedistandardeid järgivat lähenemist ehitustegevusele. | |
dc.description.abstract | Organization of Construction Works of a Hospital Building This thesis project has been prepared to reconstruct the Keila Hospital building. Building a hospital requires thorough planning, precise coordination, and effective resource management to ensure not only the building's construction quality but also its smooth and safe operation. This work focuses on this complex process, analyzing the organization of construction works of the hospital building through several aspects. The conditions of the construction site, the architectural part of the building, technical systems, construction methods, the choice of lifting mechanisms, and the plan for ensuring work, fire safety, and environmental protection are described. In the final thesis, the author has highlighted various aspects of the construction work organization of the hospital building, providing an overview of their importance and practical applications. The work includes analysis of the building's location and architectural structure, economic considerations, preparation of a construction schedule, construction site planning, description of safety measures, protocols, and assembly and demolition technology map. The list of works and the composition of the work teams were thoroughly described with the help of technology maps. In addition, the tools to be used, the necessary equipment, and the requirements for occupational safety and quality assurance were specified separately. Researching the building's location and existing conditions is important at the beginning of the construction process, ensuring that the construction work is adapted to the environmental characteristics and requirements. As part of the thesis, a general plan of the construction site was prepared, which included the entire organizational aspect of the object, and the water and electricity needs during the construction period were calculated. According to the construction budget, the cost price of the construction works of the building, excluding the company's profit and VAT, was 5,249,841 euros. The organization and general costs of the construction site make up 7 percent of the entire object's cost, totaling 361,771 euros. Creating a construction schedule is an important step in sequencing activities and optimizing the schedule, enabling accurate monitoring of deadlines and corrections if necessary. The start date of the construction works was 30.10.2023, and the duration of the works is a total of 12 months. The handover of the building to the customer and the application for a use permit will take place on 27.06.2024. In the calendar schedule, the optimal number of workers is assigned to each work stage. The site has the most construction workers in February, with 50 people working. The work described the lifting mechanisms, and the Faun ATF 60-4 mobile crane with a boom length of 40 meters and a lifting capacity of 60 tons was chosen as the main lifting device for the construction works. | |
dc.identifier.uri | https://dspace.tktk.ee/handle/20.500.12863/5097 | |
dc.language.iso | et | |
dc.publisher | Tallinna Tehnikakõrgkool | |
dc.subject | Arhitektuur | |
dc.subject.other | Hoonete ehitus | |
dc.title | Haigla korpuse ehitustööde organiseerimine | |
dc.title.alternative | Organization of Construction Works of a Hospital Building | |
dc.type | lõputöö |